Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603679

- Product Categories
- Friendly Links
Information Name: | Epoxy works, Cathay floor (certified), Zhengzhou Epoxy |
Published: | 2014-11-19 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Epoxy works, Cathay floor (certified), Zhengzhou Epoxy provided by Walker County town Kang Xiaojuan electrical materials shops. Walker County town Kang Xiaojuan electrical materials shops (www.hngtdp.com) is specialized in the "hardware, small appliances retail" business, the company adhering to the "honesty, hard service" concept, to provide you with the most quality products and services. Welcome to inquire! Contact: Mr Zhu. Epoxy floor paint is a high-value, high-quality, high-demand products Epoxy brand, so they need careful maintenance and maintenance, proper use can make the ground often as good as new, and can extend the useful life Epoxy The Company recommends the following: ① Where shall his shoes into the shop staff (at the surface so as not to scratch the surface sediment into the shop while); ② all hardware: such as iron chairs, iron tables, iron shelves, etc., shall its feet with a soft plastic or rubber-coated to avoid scratching the ground during use; ③ tractor pull will need full board lifted off the ground Epoxy materials, please pay special attention to board angle when cornering Do not scratch the ground; please clean the floor when ④ with a soft mop or wet and dry vacuum cleaner, available water or detergent, but please note that slippery floor; ⑤ Ruoyin used for a long time and cause wear or scratch, a small area can be partial repair, if a larger area it is proposed to re-roll once; ⑥ equipment into the plant before Epoxy works aerodromes covered cardboard box bottom, so as not to scratch the surface in the course of transportation equipment; ⑦ carts, scooters please use the wheel hard or elastic rubber tire, and inside and outside the plant used separately; ⑧ waxing can be done in due course. IV. Those adverse effects caused by self-leveling paint and coating properties after curing agent ratio change will solidify? A: Yes, between the epoxy resin and hardener to rely on chemical reactions to complete curing of the coating, the ratio of the curing agent and epoxy resin should be as accurate as possible, do not change. Curing agent is excessive, the hardness of the cured coating is increased, but also increases the brittleness. Insufficient amount of the curing agent, the curing time is prolonged, the hardness of the coating after curing is reduced, but the flexibility is improved, the water resistance may be increased. V. How to determine the first time Caesar feed? A: The empirical determination method: When the base concrete layer 6-7 into a dry, that is capable of supporting the weight from the people, foot up subsidence of about 0.5-1 cm prevail. VI. Spreading the first time and when to start the first time after the material plus disc sanding? A: After spreading the first time and materials, aggregates will be wetted, usually after 30-40 minutes about the indoor environment, you can add disk grinding, sanding take to prevail when there is not much on the slurry. |
Admin>>>
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility