Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603679

- Product Categories
- Friendly Links
Information Name: | Epoxy Quote | Cathay floor (certified) | Sanmenxia Epoxy |
Published: | 2014-11-22 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Epoxy Quote | Cathay floor (certified) | Sanmenxia Epoxy provided by the Walker County town Kang Xiaojuan electrical materials shops. Walker County town Kang Xiaojuan electrical materials shops (www.hngtdp.com) is specialized in the "hardware, small appliances retail" business, the company adhering to the "honesty, hard service" concept, to provide you with the most quality products and services. Welcome to inquire! Contact: Mr Zhu. Anticorrosive epoxy floor Scope: general chemical tank, electroplating, chemical, circuit boards and other acid-base of the plant, antiseptic floor. Excellent anti-corrosion properties of epoxy floor: corrosion resistance, resistance to cracking, impact resistance. Anti-corrosion epoxy floor construction process: (1) water treatment: the first floor or basement waterproofing treatment shall do; (2) Primary treatment: degreasing, wax, repair, sanding, dust; (3) Epoxy Primer: Scratch brush or mixed epoxy sealer; (4) Shop glass fiber cloth: one or several paved road; (5) Epoxy coating: construction of one or several channels; (6) Epoxy batch soil: Construction of two No empty; (7) Epoxy Topcoat: a self-leveling finish construction road roller surface finish or two; (8) Construction conservation: 24 hours after construction is completed before the Master Epoxy, 72 hours before heavy pressure. Floor paint construction quality inspection is usually after the film is completely dry before re-conducted, mainly in the following steps: 1, the film checks. Mainly to see if the paint surface is smooth, and requires no wrinkles, bubbles, sagging and other ills. 2 and a thickness. If the ground base metal epoxy floor price, to check its dry film thickness of epoxy floor plan, must be within three months of floor paint construction inspection, and require more than 85 percent of test points at or above the required thickness standard. 3, adhesion. According to the site detects floor paint adhesion. Floor paint adhesion detection methods are mainly the following: a pull method. Use the tester, require adhesion greater than 1.5Mpa;. B tape method. This is a method for metal surfaces, and require adhesion grade higher than grade 3;. C is also applicable to the metal surface of the cross-hatch tape method, requiring adhesion rating of less than 2. |
Admin>>>
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility