Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603679

- Product Categories
- Friendly Links
Information Name: | Epoxy construction program, Cathay floor (certified), epoxy floor |
Published: | 2014-12-04 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Epoxy construction program, Cathay floor (certified), Epoxy provided by Walker County town Kang Xiaojuan electrical materials shops. Walker County town Kang Xiaojuan electrical materials shops (www.hngtdp.com) is specialized in the "hardware, small appliances retail" business, the company of "honesty, hard service" concept, to provide you with the most quality products and services. Welcome to inquire! Contact: Mr Zhu. Epoxy floor paint maintaining life three important aspects: 1, ground clean. Clean mainly to clean up the sand and corrosive liquids, because the presence of sand floor paint film surface, when a vehicle traveling staff, will increase the floor wear. Corrosive liquid substance is a high-risk erosion floor, although floor paint has some corrosion, but generally only 30% of the salt water-resistant, and 10% sulfuric acid, and is generally 12 days. If the concentration is higher than the value corrosive liquid, stay longer than the time limit Epoxy construction program, that floor will be undermined. 2, reduce friction. Primarily on the ground friction of personnel and vehicles. When employees into Epoxy clean area, should be replaced by soft-soled shoes, in order to achieve reduction in personnel friction losses. Vehicle friction. Transportation by truck, trailer use in epoxy floor epoxy floor area, you need to pay attention to try to maintain steady speed and avoid braking. In the cargo unloading, stacking, avoiding side cargo, pointed to Epoxy cause scratches. 3, timely repair. When the epoxy floor appears damaged, shall promptly repair Epoxy offer, in order to avoid contamination of substances into the coating and the concrete, once and stubborn stains penetrate inside Epoxy works in conjunction with the formation, will increase the difficulty of repairing the floor paint construction quality inspection is usually after the coating is completely dry before re-conducted, mainly in the following steps: 1, the film examination. Mainly to see if the film surface is smooth and requires no wrinkles, bubbles, sagging and other ills. 2, thickness. If the ground is a metal base, to check its dry film thickness must be within three months of floor paint construction inspection and require test point thickness required to achieve 85% or higher than the standard. 3, adhesion. According to the scene detected floor paint adhesion. Floor paint adhesion detection methods are mainly the following: a pull method. Use tester requires adhesion greater than 1.5Mpa;. B tape method. This is a method for metal surfaces, and require adhesion grade higher than grade 3;. C is also applicable to the metal surface of the cross-hatch tape method requires adhesion rating of less than 2. |
Admin>>>
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11155 visitor
Copyright © GuangDong ICP No. 10089450, Walker County Kang Xiaojuan electronics shops in towns and villages All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility